How To Set an Offset Using a Line
Instructions | |||||
|---|---|---|---|---|---|
1 | Select the work offset to set.
| ||||
2 | From the Axis ID area, select the axis that you want to measure the line on.
| ||||
3 |
| Rotate table to the work offset zero position. Position the probe next to the first point and press Read Position button. |
| ||
4 |
| If you need to correct the position, press the Remove Last Position button to cancel the previously read location, then repeat the previous step. | |||
5 |
| Position probe next to second point and press Read Position button. |
| ||
6 |
| Position probe for automatic measurement and press the Execute button. Start the monitor macro on the machine. NC Gage then measures both points and calculates the angle of the line. | |||
7 | Review the measured values on screen and set the desired target values for the offset.
| ||||
8 |
| Press OK to set the selected work offset. | |||
Additional Notes
Ensure the NC does not show the Work Offset screen.
On some controls, NC Gage cannot write offsets if the screen is open.








